mechanical
Equipment Erection
Static and rotating equipment set, aligned, grouted and handed over.
At a glance
- Discipline
- mechanical
- Executed to
- IS 800
Scope of work
- Setting and grouting of static equipment
- Alignment of rotating equipment
- Structural steel and platform erection
- Rigging studies and lift plans
- Pre-commissioning checks
Method & materials
Heavy lifts are planned before they are attempted: load, radius, crane configuration and ground bearing are established on paper and signed off, and the lift is executed against that plan.
Rotating equipment is aligned cold, checked hot, and recorded both times — an alignment that is not documented has not been done.
Standards
- IS 800General construction in steel.
Work is executed to these codes. This is not a claim of certification against them.
Projects with this scope
- Automatic rim seal fire protection system — Reliance
- Hydrant system — Berger Paints
- Inert gas based fire suppression system — Tata Motors
- Automatic rim seal fire protection system — HPCL
- Hydrant system — TISCO
- Inert gas based fire suppression system — IOCL
- Automatic rim seal fire protection system — HPL
- Hydrant system — BHEL
- Inert gas based fire suppression system — GAIL
- Automatic rim seal fire protection system — IOCL
- Hydrant system — Airports Authority of India
- Inert gas based fire suppression system — MECON
- Automatic rim seal fire protection system — Bridge & Roof
- Hydrant system — IOCL
- CO₂ system — NRL
- Automatic rim seal fire protection system — BPCL
- Hydrant system — Oil India
- Inert gas based fire suppression system — RINL
- Automatic rim seal fire protection system — Bridge & Roof
- Hydrant system — GAIL
- CO₂ system — IOCL
- Automatic rim seal fire protection system — Oil India
- Inert gas based fire suppression system — ONGC